Garden Room Build Demonstration Day 2

Building; Alnwick, 16′ x 8′, uPVC Joinery

DAY 2 – Water tightness

The garden room’s roof cavities are filled with insulation and covered with a fully fastened OSB3 deck.

1

The double glazing, whether it be with uPVC or timber joinery, is fitted into the openings.

2

The Firestone Rubbercover (c) EPDM roof covering is laid out and left to settle for a period.

3
Insulation is packed into all of the interior cavities of the garden room.

4

The interior walls are covered with with a polythene vapour control layer.

5

The EPDM roof covering is adhered to the timber deck and finished around the edges.

6

If a flat roof light is being fitted, the EPDM is made water tight around the opening.

7

Day 3 – Interior fit-out

OUR RANGE

Come & have a look inside ...

Free Quotations

We Provide Free Quotation based on your custom requirements. Don’t hesitate to get in touch with us ...

Get A quote